VII.
SOD PRE-PLANT (After Application of General Soil Preparation)
Application
Instructions
1. Pre-moisten soil after finish grade has been
completed.
2. Rake lightly to open soil surface.
3. If soil does not appear moist, dampen again.
4. Spread Establish
at a rate of 25 lbs. per 1,000 sq. ft.
5. Water thoroughly after application.
6. Lay sod following regular watering procedure for
new sod.
If soil conditions are
hard or rocky and tillage is difficult to the extent of not being able to
use General Soil Preparation, then use 100 lbs. per 1,000 sq. ft. (instead
of 25 lbs.) of Establish
and rake in as deep as possible into the soil profile.
|